[1]
Duong, B. 2020. Determining the quantity of access tubes for quality control of bored pile concrete based on probability approach. Journal of Science and Technology in Civil Engineering (JSTCE) - HUCE. 14, 2 (Apr. 2020), 76-86. DOI:https://doi.org/10.31814/stce.nuce2020-14(2)-07.